
High-Capacity Power for Industrial Operations
The Rocky Mountain Logistics Hub is a 120,000-square-foot warehouse and distribution facility serving regional freight operations. The project required a heavy-duty electrical system designed to support conveyor automation, forklift charging stations, and high-bay warehouse lighting.
Our team installed a 2,000-amp main service with multiple distribution panels positioned strategically throughout the facility to minimize voltage drop. Dedicated circuits were provided for industrial equipment and future automation upgrades to ensure scalability as operational demands increase.

Energy-Efficient High-Bay Lighting & Automation Readiness
Warehouse lighting was engineered using high-output LED high-bay fixtures paired with motion sensors to reduce energy usage during off-peak hours. This system improves visibility and safety while reducing operating costs over the building’s lifecycle.
Infrastructure was also installed for future robotic automation and conveyor expansion, allowing the facility to scale operations without major electrical redesign. The system was designed with expansion in mind, reducing long-term capital costs for ownership.
